Do you think evaluation and control efforts contribute to the high failure rate in such external efforts?

Do you think evaluation and control efforts contribute to the high failure rate in such external efforts?

Discussion:

Evaluation and control appear critical to the success of any effort to obtain technology externally. Do you think evaluation and control efforts contribute to the high failure rate in such external efforts? How and Why? Or why not?

Note:

>Your initial post should be direct answer to the posted question(s), and must be a minimum of 250 words long and completely address the posted question(s). Additionally, it must include a minimum of two references included in APA format (6th ed.).

>No plaigarism