For this assignment, you will brainstorm two lists. For the first list, which you will label “Building a Railroad,” I want you to list in as much detail as possible all of the things you would need to do to start a railroad business (with track that covers a significant distance). List all the tasks you would need to perform, the different types of workers you would need to hire, the raw materials you would need to get, etc.
For the second list, labeled “Managing a Railroad,” you will list everything you would need to do to run this railroad business on a daily basis (people to hire, materials needed, tasks to perform, etc.).
The more detailed the lists, the better.